1955Apache.com
Menu
Home
Blog
Media
New Steering Wheel and Steering Colum
FAST Computers ( EFI / TCU / Ignition)
Random Cab Photo
Fuel Lines Mock Up
Bed Rails Mock Up
Front Fender Install (Inner/Outer) Pt2
Front Fender Install (+Hood)
Front Fender Install (Inner/Outer)
Door Sanding
Cab Sanding Begins
Random Front End Photo
Welding Touch Ups On Cab
Painless Wiring Harness Works Pt2
Front Fender, Hood, Grill Mock Up
New Doors Mock Up
Rad Install
4 Link Install
Cab Body Work
Lokar Shifter & Transmission Mount Install
Lokar Shifter Mock Up
Painless Wiring Harness Works Begins
New Floor Install (2)
New Floor Install
New Floor Mock Up
Small Back Window To Big Back Window Upgrade (4)
Small Back Window To Big Back Window Upgrade (3)
Small Back Window To Big Back Window Upgrade (2)
Small Back Window To Big Back Window Upgrade
Cab To Frame Mock Up
Officially A Roller
Front Suspension Mock Up
POL Fuel Pump/Filter Install
POL Gas Tank Install
Rad Support Mock Up
Wilwood Brakes (F/R)
Inglese 8 Stack + FAST EFI (4)
Inglese 8 Stack + FAST EFI (3)
Inglese 8 Stack + FAST EFI (2)
Inglese 8 Stack + FAST EFI
Front Tires Mock Up
Tires/Wheel Mock Up To Rear Fender
Rear Tires/Rims Mock Up
Tires Mounted to Rims
Big Fat MT Tires
MT Tires Arrived
Polished Rims ready for tires
Rack and Pinion Added + Clean Up - Jan 12th 2019
Engine Meets Frame - Jan 6th 2019
9 Inch Posi Clean Up - Jan 12th 2019
HEIDTS Coil Over Shocks - Jan 11th 2019